Flender/Flender Gear Units/Helical gearboxes H4
ion motor/geared motor with suitable torque limiter. 1 of 1 INDRADHANUSH GAS GRID LIMITED TECHNICAL SPECIFICATION FOR NATURAL GAS COMPRESSOR

STATION FOR NORTH EAST GAS GRID PIPELINE PROJECT ______________________________________________________________________________________________ TS NO.: MEC//2UU/0/2/0 Electrical system Chapter-0.0 2, MECON Limited, All Right

Reserved Pag 1 of 2 The motor shall be mounted on MS hot dip galvanised plate insid the mast with

possibility of adjusting its position. The drive shall be capable of taking the load of whole lantern carriage with lum

inaries, control gearboxes, aviation obstruction light mounted on it. Manual handle shall be supplied along with power tool for operating the winch manually in case of power failure. Reversi ble type starters for motor, ontactors for lighting circuit, MCB isolator switch etc. shall be provided in weatherproof enclosure for safe area. For high mast mounted in hazardous area Motor and control panel sha ll be flame proof type Ex- temp class-T3. 4.1 Light Fittings The light fittings shall be of integral type flood light type ith LED lamps. The quantity,wattage, mounting position/angle and optical character istics shall be decided on the basis of the following illumination requirement. Minimum 3 lux illumination shall be achieved at horizontal istance of 3 meters from the bottom of the mast all around. Illumination level of 1 0 lux shall be sufficient at plant boundary wall, parking area, Administrative Building, etc . Minimum of 3-5 lux is required to be achieve at horizontal distance of 1 Metre rom the bottom of the mast towards all area. Minimum 2 lux shall be achieved in the area adjoining at the perimeter of 4 meter (approx.) rad ius considering the mast bas at the centre. All lighting performances shall be checked holding the lux meter in horizontal plane at ground level. 0.0.1 SUBS