Contract document. All equipments, materials, compone nts etc. shall be new and spe cifically purchased for this job from approved

vendors, duly inspected by third par ty inspection agency along with manufacturing certificate for relevant pressure. For other contractors supplied

equipment/ materials/ pa rts/ components, contractor ha to submit test certificate as per technical specification/ applicable codes/ pproved QAP (as

applicable) before supply. Piping facilities from the hook up point/ battery limit to comp ressor shall be hydrostatically tested to

test pressure equivalent to 1.5 times design pressure as per Flushing and Testing of Piping System enclosed with the Contr act document. All valves in the piping network being hydro tested shall be kept the crack open position. Holding time shall be minimum six hours . The construction work shall be carried out based on the approve drawings. CONTRACTOR shall carry out all works in accordance with the dra wings and reference specifications/ doc uments with the Contract. The piping fabrication, erection, welding, flushing and hydro testing and painting works shall be carried out as pe standard piping specification enclosed with Contract. 1 of 1 SPECIFICATION FOR HEALTH, SAFETY AND ENVIRONMENT (HSE) MANAGEMENT SPECIFICATION NO.: MEC//0/2/6 (OIL & GAS SBU) MECON LIMITED DELHI 1 0 Rev. : 0 Edition : 1 1 of 1 STANDARD TECHNICAL SPECIFICATION MECON LIMITED REGD. OFF: RANCHI 8 OIL & GAS SBU, DELHI DOCUMENT NO. Page 1 of 1 TITLE MEC//0/2/6 REVISION : 0 HEALTH, SAFETY AND ENVIRONMENT (HSE) MANAGEMENT EDITION : 1 SL. NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCES 3.0 REQUIREMENT OF HEALTH, SAFETY & ENVIRONMENT (HSE) MANAGEMENT SYSTEM TO BE COMPLETED BY BIDDERS. 4.0 DETAILS OF HSE MANAGEMENT SYSTEM BY CONTRACTOR 5.0 RECORDS ANNEXURE- ANNEXURE- ANNEXURE- ANNEXURE- ANNEXURE- PREPARED BY: (Shalini Singh) CHECKED BY: (Sunil Kumar) APPROVED BY: (.. Jo