Flender/Flender Gear Units/Helical gear box H3
cialist companies for chemical cleaning. Such companies also sell special cleansing agents for removing such deposits. Before using these cleaning

agents, ensure that they will not damage the coil materials (consult Siemens). Observe the manufacturers instructions at all times when

using different cleaning agents by several manufacturers. Avoid burns when working with corrosive cleaning agents. Always observe the manufacturers instructions

for safety and use. Wear personal protective equipment (gloves, safety glasses)! Seriously contaminated cooling coils must be replaced. Consult our

Customer Service. Reconnect the water in and outflow pipes. 1.2.9 Check air oilcooler The instructions in items 5.8.3, 7.1.2 and 1.1 must be observed! Close the stop valves in the coolant in and outflow pipes. Remove dirt from the cooler block. Check the condition of screw connections and, if necessary, replace. 1.2.1 Check water oilcooler The instructions in items 5.8.4, 7.1.2 and 1.1 must be observed! Close the stop valves in the coolant in and outflow pipes. Inspect cooler for leaks in the piping. Check the condition of screw connections and, if necessary, replace. 1 / 1BA 5 en 0/2.2.1 Check hose lines Even when adequately stored and subjected to permissible loads, hoses and hose lines are subject to natural ageing process. This limits their period of use. The period of use of the hose lines must not exceed 6 years from the manufacturing date stamped on them. The period of use can be determined using available test and empirical values, taking into account the conditions of use. The operator of the system must ensure that hose lines are replaced at suitable intervals of time, even if no defects which may affect their safe operation are identifiable on them. Hose lines must be inspected for safe working condition by an expert before the plant is first put into operation and thereafter at least once year. If during inspections faults are found, these must be rectified imm