Flender/Flender Gear Units/Helical gearboxes H3
cification. his shall be approved by Engineer-in-Charge before application of paints on surface of chimney. 2.8 At the discretion of

Engineer-in-Charge, the paint manufac turer must provide the expert technical service at site as and when requir ed. This service

should be free of cost and without any obligation to the owner, as it would be in the interest of

the manufacturer to ensure that both surface preparation and application are carried out as per their recomm endations. 2.9 Final

inspection shall include measurement of paint dry film thickness. Adhesion Holiday detection check of finish and workmanship. The thickness should be measured at as many points/ locations as decided by Engineer-in-Charge and shall be within + 1% of the dry thickne ss, specified in the specifications. 1 of 1 STANDARD TECHNICAL SPECIFICATION MECON LIMITED REGD. OFF: RANCHI 8 OIL & GAS SBU, DELHI DOCUMENT NO. Page 4 of 5 TITLE MEC//0/2/0 REVISION : 0 SHOP & FIELD PAINTING EDITION : 1 2.1 The contractor shall arrange for spot checking of paint aterials for Sp. Gr., flow time (ford cup) and spreading rate. 2.0 GUARANTEE 2.1 The contractor shall guarantee that the chemical and physical properties of paint materials used are in accordance with the specifications contained herein/ to be provided during execution of work. 2.2 The contractor shall produce test report from manufacturer regarding the quality of the particular batch of paint supplied. The Engineer -in-Charge shall have the right the test wet samples of paint at random, for quality of same as stipulated in clause 1 above. Batch test report of manufacturers for each batch paint supplied shall be made avai lable by the contractor. 2.0 QUALIFICATION CRITERIA OF PAINTING CONTRACTOR Painting contractor who is awarded any job for MECON, projects under this standard must have necessary equipments, machinery, tool nd tackles for surface preparation, paint application and inspection. The contractor must ha