Flender/Flender Gear Units/Helical gearboxes H3
e 3. Supply, erection, testing & commissioning of MDFs, accessories such as rings, cable support, Krone make LSA- Plus connection

modules fitted ith IPM (Integrated Protection Module), on all the exchange side lin es & stainless steel back- mount with

cover on LSA- Plus modules 4. Supply and installation of Network switch (separate for EMS and Data at each building

level), Light interface Unit, patch panel, Network rac 5. Supply and laying of Armored Optical fiber cable for backbone of

IT and EMS system 6. Supply and laying of Armored Multicore jelly filled cable for telecom system 7. PVC conduit, HDPE pipe, GI condu it, Hume pipe, Cable marker, ca ble tag, ferrule etc. 8. Third Party Device Integration through BACnet / MSTP or BACnet /IP or Lonworks or Modbus RTU and Modbus TCP protocols with suitable edia converter. 9. EMS Software, EMS server and workstation etc. 1. Supply and Integration of water me ter with media converter if equired etc. 1. Integration of Energy eter, gas meter etc. 1. EMS servers should be connected Router with firewall for con nection to Internet. 1. Any other required for completeness of system like PVC conduit, , ferrules etc. 0.1.0 ENERGY MANAGEMENT SYSTEM: 0.1.0.0 General 1 of 1 INDRADHANUSH GAS GRID LIMITED TECHNICAL SPECIFICATION FOR NATURAL GAS COMPRESSOR STATION FOR NORTH EAST GAS GRID PIPELINE PROJECT _____________________________________________________________________________________________ TS NO.: MEC//2UU/0/2/0 Energy management sys tem, IT and telecom se rvices Chapter0.1 2, MECON Limited, All Right Reserved Page 3 of 2 The Monitoring Software shall be web-enabled monitoring syste intended to monitor an entire electrical distribution infrastructure, from incoming utility feeds down to low voltage distribution points. The system shall be designed to monitor and manage energy consu mption throughout an enterprise, whether within single facility or ac