Flender/Flender Gear Units/Helical gear units H3
ECHNICAL SPECIFICATION MECON LIMITED REGD. OFF: RANCHI 8 OIL & GAS SBU, DELHI DOCUMENT NO. Page 5 of 5 TITLE

MEC//0/2/6 REVISION : 0 HEALTH, SAFETY AND ENVIRONMENT (HSE) MANAGEMENT EDITION : 1 FORMAT NO. : HSE-9, REV. 0 RADIATION

WORK PERMIT Project : . .: : : Name of Contractor : . : Name of Contractor : Line No.

/ Equipment No. /Structure to be dismantled : Location details of dis mantling / dem olition with sketch : (Cle

arly indicate the area) The following items have been checked & compliance shall be ensured during currency of the permit : . No. Item Description Done Not Applicable 1. Services like power, gas supply, water, etc. disconnected. 2. Dismantling / Demolishing met hod reviewed & approved. 3. Usage of appropriate PPEs ensured. 4. Precautions taken for neighboring structures 5. First-Aid arrangements made 6. Fire fighting arrangements ensured 7. Precautions taken for blasting (Contractors Supervisor) ( ) Permission is granted. (Permit issuing authority) Name : Date : 1 of 1 STANDARD TECHNICAL SPECIFICATION MECON LIMITED REGD. OFF: RANCHI 8 OIL & GAS SBU, DELHI DOCUMENT NO. Page 5 of 5 TITLE MEC//0/2/6 REVISION : 0 HEALTH, SAFETY AND ENVIRONMENT (HSE) MANAGEMENT EDITION : 1 Completion Report : Dismantling / Dem olishing is completed on __________ Dat at __ ________ Hrs. Materials / debris transported to identified location Tagging completed (as applicable) Services like power, gas supply, water, etc. restored (Permit issuing authority) 1 of 1 Page 1 of 9 PIPELINE LAYING AND TERMINAL WORKS FOR NORTH EAST GAS GRID PIPELINE PROJECT Doc. No. MEC/2UU/0/2//0/1, R0 MECON LIMITED PIPING MATERIAL SPECIFICATION (NORTH EAST GAS GRID PIPELINE PROJECT) DOC. NO. MEC/2UU/0 /2//0/1, R0 (PROCESS & PIPELINE DESIGN SECTION) MECON LIMITED DELHI - 1 0 1 of 1 P