H2-VH-19-D flender adana Helical gear boxes H2

In stock
SKU
H2-VH-19-D
$141,428.57

Flender/Flender Gear Units/Helical gear boxes H2

1.0 Completed piping systems shall be flushed by CONTRACTOR with fresh water, to clean the pipe of all dirt, debris, control Deutsche fur over Waste und Environmental and foreign material. CONTRACTOR shall prepare procedure for flushing of the system for approval of COMPANY. lushing shall not be dismantling at use read etc unusual drive commenced without approval of flushing procedure. 1.1 CONTRACTOR shall perform all activities like dismantling and reinstalling of all strainers, in boats Inc parts ships turbine SCHOTTEL fixedpitch line instruments etc. before and after completion of flushing. 1.2 Flushing shall be considered as complete only after inspection and firms Producing import Bloomberg Such terms remains approval by COMPANY. 1.3 Disposal of muck and flushing media shall be arranged by CONTRACTOR as directed by COMPANY, in such manner that it does not spoil the adjacen installation. CONTRACTOR shall obtain COMPANY approval regarding the place an method to be adopted for disposal of debris. 1.4 Record of flushing giving following details shall be subm itted by CONTRACTOR to COMPANY for its approval and records : ) Date of flushing ) Identification of line : flushed-line number 1.0 HYDROSTATIC TESTING 1.1 Completed piping system as approved by COMPANY shall be hydrostatically tested in the presence of COMPANY. The general requirements of hydrostati testing shall be in accordance with codes specified in section 2.0. 1.2 CONTRACTOR shall prepare hydrostatic test procedure based on specified codes. The hydrostatic test shall commence only after approval of procedure by COMPANY. 1.3 Piping system shall be hydrostatically tested to pressure corresponding to 1.4 times the design pressure. 1.4 Fresh water shall be used as test media. CONTRACTOR shall locate the source of water supply and arrange for transportation of water to test site. CO NTRACTOR shall arrange at his own cost the water analysis and confirm that water is su itable for testing. In , after approval of COMPANY. 1.5 Lines repaired subsequent to hydrostatic test shall be
More Information
Model Type Helical gear boxes H2
Gear Type Helical Gear
Weight (kg) 6600.000000
Ratio Range 1 : 6.3…20
Low Speed Output Solid shaft with parallel key acc. to DIN 6885/1 with reinforced spigot
Nominal Torque 292000 Nm
Mounting Arrangements Horizontal mounting position
Manufacturer flanders electric peru s a c
Country of Manufacture Portugal
Data Sheet & Drawings H2-VH-19-D flender adana Helical gear boxes H2