Flender/Flender Gear Units/Bevel-helical speed reducers B2
ly cut ff the power and apply the brake, when the car travel beyond the terminal landing. () Traction Machine

The design ambient temperature for this equipment shall be tak en, as 5 . The motor insulation shall be class

or superior. The motor should 4 regenerative or dynamic braking is applied. Space heater with thermostat sh all be provided

where necessary. 1 of 1 INDRADHANUSH GAS GRID LIMITED TECHNICAL SPECIFICATION FOR NATURAL GAS COMPRESSOR STATION FOR NORTH EAST GAS

GRID PIPELINE PROJECT TS NO.: MEC//2UU/0/2/0 0 El evators Chapter-0.1 2, MECON Limited, All Right Reserved Page 2 of 3 Protective relays shall be furnished on the controller to protect against phase reversal, low voltage and phase ailure. Overload and other pro tective relays shall also be furnished for traction motor. Each car shall be equipped with 4 mmdia cabin type ventilat ion fan 0.1.0.0 Electrical Details General The scope of work of the Tenderer shall include design, manufac ture, shop testing, supply, erection, testing and commissioning of all new electrical equip ment required for lift operation. The scope of work of tenderer shall also include dismantling of existing electrical control panels, motors, cables etc. of the existing Lifts. The scope of work of tenderer shall also include minor civil wo rks like chipping/cutting of floor/walls, provision of insert etc. required for erection of panels, earthing, laying of cables etc. The electrical scope of work shall commence from the Purchaser power supply points in Machine room and shall include bu not limited to the following : - All cables ( power , control & signal) , motor, brakes, motor control panel (lift panel)including VVVF control(digi tal) for AC drives, limit swit ches, digital indicators, illumination system inside the elevator, flexible cables requir ed for the system, combined luminous buttons