Flender/Flender Gear Units/Bevel-helical speed reducers B2
mmiss ioning, check-up, operation, abnormal condition, maintenance and repair etc. ii) List of spares for 2 years normal operation/ma intenance.

iii) Ordering specification including, catalogues and details for al spares ( including proprietary items) al ong with spare list. Scope

of work of the Tender shall also cover supply, erection esting and commissioning of all electrical items as covered under

Electrical details . 0.1.0 TECHNICAL SPECIFICATION FOR SUPPLY 0.1.0.0 Mechanical details 1 of 1 INDRADHANUSH GAS GRID LIMITED TECHNICAL SPECIFICATION

FOR NATURAL GAS COMPRESSOR STATION FOR NORTH EAST GAS GRID PIPELINE PROJECT TS NO.: MEC//2UU/0/2/0 0 El evators Chapter-0.1 2, MECON Limited, All Right Reserved Page 1 of 3 General: The elevators shall conform to the following stipulations, in eneral: The elevator shall be designed in accordance with IS: 1 (Pa rt ) Part 2/Sec 1, Part 3/Sec 2 and IS : 1 (Part 4/ Sec 1 to 2 and ther relevant IS specifications and subject to any modifications and requirement specified herein after. The elevator will be installed inside the building to facilitat movement of man and material to various floor levels and shall operate from lower ost level to top most level and will be located at identified location as shown in enclosed TS drawing of lift well. The elevator shall be operated electrically with fittings as in dicated in technical parameters. The elevator shall be equipped with all standard safety systems cranking in case of power failure , emergency rescue battery back-up (Automatic Rescue Device), hand wheel connected with ing of elevator to the nearest landing level incase of power failure, limit switches, indicators, over speed safety governor for car , emergency light fittings, ARD etc. Fireman witch at all the floors including ground floor The elevator shall be suitabl fo