h VDE-2 shall be as follows: . High voltage test ii. Conductor Resistance measurement for core and drain wire iii.

Insulation Resistance The final Acceptance test in line with applicable standard to carried out on cable samples taken from end

with sampling plan as specified in the standard or agreed under contract shall be as follows: . Overall dimension, conductor

size, number of stands, lay length , direction of lay, thickness of insulation, core identification, shielding coverage/ overlap, inner sheath

and outer sheath thickness. ii. In case of armoring the no of armor wire/ strip, size and overage to be measured. Armor wire sample to be checked for tensile, Elongati on, wrapping/ torsion and adhesion test. Samples to be also checked for mass of zinc coating. iii. Conductor Resistance measurement iv. Annealing test (for reference) . Insulation resistance (volume resistivity) vi. Characteristic impedance, Atte nuation, Mutual Capacitance, Cross talk Only one sample of any size fro the offered lot of insulation and Sheath to tested for: . Thermal stability test. ii. Oxygen index on Outer sheath as per ASTM--2 iii. Smoke density on outer sheath as per ASTM -2 iv. Acid gas generation test on outer sheath as per IEC-7 . Fire resistance test as per SS 4 vi. One length of cable to checked for length measurement and hile measurement of length visual def ects if any, sequential marking , embossing are to be checked. vii. Tensile and elongation test 1 of 1 INDRADHANUSH GAS GRID LIMITED TECHNICAL SPECIFICATION FOR NATURAL GAS COMPRESSOR STATION FOR NORTH EAST GAS GRID PIPELINE PROJECT TS NO.: MEC//2UU/0/2/0 Control & Instru mentation (&) Chapter-0.0 2, MECON Limited, All Right Reserved Page 6 of 1 viii. Volume resistivity test One sample of any size from the complete order may be selected for: . Tensile and elongation of PVC insulation and outer sheath af ter ageing ii. Flammabilit