cking arrangement of valves etc. as and when required. 2.6 Preparation of Isometrics, bill of materials, supporting details of all

NON-IBR lines upto 2-1/2" within the unit battery limit and get subsequent approval from Engineer-in-Charge as and when called for.

2.7 Obtaining approval for drawings prepared by contractor from statutory authority, if required. 2.8 Spun concrete lining of the inside

of pipes 3" NB & above including fittings and flanges as required in accordance with specification. 2.9 Rubber lining inside

pipes, fittings, flanges as and when equired, in accordance with specification. 2.1 Radiography, stress relieving, dye penetration, magnetic particle test etc. as required in specification. 2.1 Performing PMI using alloy analysers as per 'Standard Specification for Positive Material Identification at Construction Sites, 6-8-0'. 2.1 Casting of concrete pedestals and fabrication & erection of small structures for pipe supports including supply of necessary materials. 2.1 Providing insert plates from concrete structures and repair of platform gratings around pipe openings. 2.1 Making material reconciliation statement and return of Owner' supply left over materials to Owner' storage. 2.1 Flushing and testing of all piping systems as per standard specification for inspection, flushing and testing of piping systems (Specification No. MEC//0/2/1 ). 1 of 1 STANDARD TECHNICAL SPECIFICATION MECON LIMITED REGD. OFF: RANCHI 8 OIL & GAS SBU, DELHI DOCUMENT NO. Page 3 of 6 TITLE MEC//0/2/0 REVISION : 0 PIPING FABRICATION AND ERECTION EDITION : 1 3.0 BASIS FOR WORK 3.1 The complete piping work sha ll be carried out in accordance with the following 3.1.1 "Approved for Construction" drawings and sketches issued by MECON to the Contractor - Plans and/or Isometrics. 3.1.2 "Approved for Construction" drawings and sketches issued by Turn-key bidders to the Contractor - Plans and/or Isometrics. 3.1.3 Approved Process licensor' standar