Flender/Flender Gear Units/Helical gearboxes H3
ection an endorsement would be made in the inspection certificate about the availability of the documents. 1 of 1 INDRADHANUSH

GAS GRID LIMITED TECHNICAL SPECIFICATION FOR NATURAL GAS COMPRESSOR STATION FOR NORTH EAST GAS GRID PIPELINE PROJECT TS NO.: MEC//2UU/0/2/0

0 El evators Chapter-0.1 2, MECON Limited, All Right Reserved Page 4 of 3 The Tenderers erection agency must have

valid electrical Con tractorslicense issued by the concerned state government. He should have in his employment sufficient number of electricians

and supe rvisors holding valid license. The tenderer shall arrange el ectric power for erection purpose. The Tenderer shall supply all onsumable and auxiliary material like scaffolding materials, soldering flux, electr odes, insulation material, PVC tapes and other sundry materials needed for the ompletion of erection. The testing and commissioning of the elevators shall be done in presence of the representatives of the ma nufacturer nd purchaser. The elevator after erectio shall be tested as follow: ) Load test with 1% and 1% of rated load as per clause no.8.1 .6 of IS 1 (Part 2/Sec : 2. ii) static load test with 1% of rated load as per IS 1 (Par 2/Sec : 2 to check that the brake will sustain the car. iii) All other tests on electrical system as mentioned in IS 1 ( Part 3/ Sec 1 & -2 clause 1. iv) Any other test felt necessary by Purchaser and Tenderer to ensu re proper functioning and installation of the lift. ) Demonstration of the functioning of all safety provisions made available in the elevator. vi) All other inspection as er IS 1 (Part 1. While conducting tests on the elevator, the Tenderer shall be eld responsible for any manufacturing defect as well as for defective workmanship arried out during the erection work. The Tenderer shall arrange for slings, wire rope , stop watches and other necessary equipment/ in