Flender/Flender Gear Units/Helical gear units H2
be included in the scope of supply of the Tenderer. list of uch tools and tackles shall be furnished by

the Tenderer. Supply of following drawings , documents and manuals: . Drawings/documents for approval Following drawings, documents an calculation for

the elevator shall be submitted for approval ) The General Arrangement drg. elevator showing the complet elevation and plan views

of hoist way & machine room with drive assembly & drive ase detail of elevator, ground pit plan with necessary

ins ert details and load data. ii) Detail arrangement drawing of elevator car showing all accessor ies and fittings attached to the car. iii) Following electrical drgs. shall also be submitted by the Tenderer for approval and or information prior to tart of manufacture: GA of control panel. 1 of 1 INDRADHANUSH GAS GRID LIMITED TECHNICAL SPECIFICATION FOR NATURAL GAS COMPRESSOR STATION FOR NORTH EAST GAS GRID PIPELINE PROJECT TS NO.: MEC//2UU/0/2/0 0 El evators Chapter-0.1 2, MECON Limited, All Right Reserved Page 1 of 3 GA & Data sheet of motor. GA of battery, battery charg er & Inverter panel. Calculation for battery. Power and control schematic diagram Cable schedule Schematic control circuit drawing with wiring diagram. Control write-up & detail of int erlocking of lift operation. Earthing Layout drawing iv) Motor power calculation and VVVF drive sizing for the eleva tor. ) Leaflets and catalogues for motor, brake, couplings, bearing , wire rope and electrical equipments etc. ) , other drawings, documents, structural, mechanical and electrical calculations or scrutiny and reference if required. Drawings documents for approva of statutory authority Drawings and documents to be furnished along with the supply of equipment: ) Instruction manual giving instru ction for erection, pre-co