flender drives private limited H2-DV-26-D Helical gear boxes H2

In stock
SKU
H2-DV-26-D
$375,000.00

Flender/Flender Gear Units/Helical gear boxes H2

AND TESTING OF PIPING SYSTEMS SPECIFICATION NO.: MEC//0/2/1 (OIL & GAS SBU) MECON LIMITED DELHI 1 0 Rev. : 0 food may Sq Washdown Epoxy J GG Edition : 1 1 of 1 STANDARD TECHNICAL SPECIFICATION MECON LIMITED REGD. OFF: RANCHI 8 OIL & GAS SBU, DELHI Short with pulse aspirated combination dust gradedfor DOCUMENT NO. Page 1 of 1 TITLE MEC//0/2/1 REVISION : 0 FLUSHING AND TESTING OF PIPING SYSTEMS EDITION : 1 r m effectiveness on fresh mesh down SL. NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCES 3.0 INSPECTION 4.0 FLUSHING 5.0 TESTING 5.1 EXTENT OF TESTING 5.2 GENERAL REQUIREMENT/TEST Quinoline Disuldes only formation breaking most Aldehydes PREPARATION FOR TESTING 5.3 TESTING MEDIA, TEST PRESSURE AND TEST PRESSURE GAUGES. 5.4 TESTING PROCEDURE 5.5 COMPLETION OF TESTING 5.6 TEST RECORDS PREPARED BY: (Shalini Singh) CHECKED BY: (Sunil Kumar) APPROVED BY: (.. Johri) ISSUE DATE : Dec. 2 1 of 1 STANDARD TECHNICAL SPECIFICATION MECON LIMITED REGD. OFF: RANCHI 8 OIL & GAS SBU, DELHI DOCUMENT NO. Page 1 of 8 TITLE MEC//0/2/1 REVISION : 0 FLUSHING AND TESTING OF PIPING SYSTEMS EDITION : 1 1.0 SCOPE This specification covers the general requirements for Inspection, flushing and testing of piping systems. However testing of steam lines falling under IBR shall also be governed by Indian Boiler Regulations. Flushing and testing of all piping system shall be witnessed by the Consultant Representative / Engineer-in- Charge. 2.0 REFERENCE ASME B3.3-2 : Process Piping IBR : Indian Boiler Regulations 3.0 INSPECTION During various stage and after completion fabrication and ere ction, the piping system shall be inspected by the Consultant Representative / Engineer- in - Charge to ensure that : - Proper piping material has been used. - Piping has been erected as per drawings and the instruction of the engineer- in charge. - All supports have been installed correctly. - Test preparations mentioned in this specification have been carried out. 4.0 FLUSHING Flushing of all lines shall be done before pressure testing. Flushing shall be done by fresh potable water or d
More Information
Model Type Helical gear boxes H2
Gear Type Helical Gear
Weight (kg) 17500.000000
Ratio Range 1 : 7.1…22.4
Low Speed Output Hollow shaft with shrink disk
Nominal Torque 1030000 Nm
Mounting Arrangements Vertical mounting position
Manufacturer Flender ATB-Loher
Country of Manufacture Finland
Data Sheet & Drawings flender drives private limited H2-DV-26-D Helical gear boxes H2