system along with 1:1 hot redundant common PLC for respective plant automation. The & system shall ensure safe, fficient and

smooth operation of the plant and equipment with minim um intervention of the operating personnel during normal working of the

Compressors, loa fluctuation / shut down of the Compressors. General requirements ) The Tenderer shall furnish the complete Control and

Inst rumentation system including dedicated SIL-3 redundant TMR Programmable Logic Cont rol System for Natural Gas compressors and Common 1:1

Hot redundant PLC for complete plant operation & control, Primary, Secondary Instruments, Panels, odular control Desks, mosaic grid mounting Alar Annunciation System, Maintena nce and Calibration Equipment, Control Va lves and Actuators, Instrument ation Cables and Process Connection and impulse Piping and Electrical Actuators/ MOV etc. as identified in the specification. ) The Tenderer shall provide all material, equipment and services so as to make totally integrated Instrumentation and Control System together with all accessories, auxiliaries and associated equipments ensuring operability, maintainability and reliability. This work shall be consistent with New Natural Gas Compressors plant practices and shall be in compliance with all applicable codes, standards, guides, statutory regulations and safety requirements in force. ) Further, Tenderer shall also include in his proposal and shall furnish all equipment, devices and services, which may not be specifically stated in he specification but are needed for completeness of the equipment/systems furnished by the Tenderer for meeting the intent and require ments of the specification. 1 of 1 INDRADHANUSH GAS GRID LIMITED TECHNICAL SPECIFICATION FOR NATURAL GAS COMPRESSOR STATION FOR NORTH EAST GAS GRID PIPELINE PROJECT TS NO.: MEC//2UU/0/2/0 Control & Instru mentation (&) Chapter-0.0 2, MECON Limited, All R