OR NATURAL GAS COMPRESSOR STATION FOR NORTH EAST GAS GRID PIPELINE PROJECT TS NO.: MEC//2UU/0/2/0 0 El evators Chapter-0.1 2,

MECON Limited, All Right Reserved Page 3 of 3 ) Measurement of power consumption of various drive motors while operating

at performance guarantees levels. ) Continuous run system performance test. ) All other parameters of the equipment or system indicated

in th specification. Performance Guarantee Parameters & Rejection Limit Performance Guarantee Parameters Capacity Toleran ces Rejection Point Limits Capacity of

various equipment without undue noise etc. As per rated capacity indicated (-) 0.0% Below rated capacity Noise Level 9 dBA at 1:8 mete (+/-) 0.0 %Above this level Bearing Vibration Level 4 microns (+) 0.0 %Above this level (peak to peak) Guarantee for design and operatio of the equipment / system shall be such as the system shall be capable of operating ontinuously for 7 days for two hift operation. The various performance and operating parameters shall be checked as per relevant Indian Standards. 0.1.1 LIST OF DRAWINGS ENCLOSED Clearance diagram 0.1.1 SCHEDULE OF ITEMS 1 of 1 INDRADHANUSH GAS GRID LIMITED TECHNICAL SPECIFICATION FOR NATURAL GAS COMPRESSOR STATION FOR NORTH EAST GAS GRID PIPELINE PROJECT TS NO.: MEC//2UU/0/2/0 0 El evators Chapter-0.1 2, MECON Limited, All Right Reserved Page 3 of 3 SUPPLY, ERECTION, TESTING AND COMMISSIONING (Design, Engineering, , , , , , sting at works, Packing & forwarding etc of the equipment, erection, testing an commissioning, Supply of commissioning & start-up, Spares as required, Initial Fill of Oil & lubricants and other consumables, including performance guarantee tests as per Technical Specification) .. Items Location 1 6Kg Capacity passenger elevato Administration