Flender/Flender Gear Units/Bevel-helical gearboxes B3
sed of the tests one week in advance of the test dates. . at manufacturers works before equipment is released

to site. . during installation where testing is necessary before final connections are made. . after installation is complete. This

is to be witnessed by the Engineer. At each stage tests shall be carried out by the contractor and typed

report submitted to the engineer. After submission of the test report the engineer may call for all or some of

the tests to be repeated in his presence. WQ 6-1 MAHATMA GANDHI WASTEWATER PUMP STATION EMERGENCY WORK 1 AA PROJECT SPECIFICATION AA.1 SCOPE OF WORK This specification arises from the need to Design, Manufacture, Delivery, Installation, Testing and Commissioning of Stationery Generator for Mahatma Gandhi Pump Station to maintain its existing infrastructure with emergency electrical supply where required. The Manufacturer shall supply range of mobile standby generator set (5KVA- 1KVA) (as depicted within clause B6. Siemens Flender 0.8 PF or higher, 4V, 5 Hz, three phase, installed within sound attenuated weatherproof ISO containers, complete with on board fuel tanks, sufficient for 1 hour continuous operation, together with manual/automatic changeover equipment with mechanical interlocks and all ancillary equipment, generator connection panels, trailing cables, male and female plugs, shore supply cables and sockets and trailers complete, as is required for operational use within the geographical boundaries of the eThekwini Municipality and range of stationary standby generator sets between 1kVA and 2 0kVA (as depicted within clause B1. Siemens Flender 0.8 PF or higher, 4V, 5 Hz, three phase, together with manual/automatic changeover equipment with mechanical interlocks and all ancillary equipment, generator connection panels, installed within sound attenuated weatherproof, containers/enclosures, with on-board fuel tanks, complete with all ancillary equipment. Please note that the generato